Skip to harness content
Open technical reference map

Production domain 13

Availability, Recovery & Operations

3 capabilities and 3 controls define the canonical obligation set for this domain.

Domain 13Dependencies: Observability
Canonical pathcontrols/production-layers.v2.jsonRevision69bab1cInspect source

Applicability and claim boundary

This domain defines obligations. It does not prove that a specific repository or run satisfies them.

Applicability
Assess this domain when the authorized workload can affect its capabilities. Resolve every control as required, potentially affected, or not applicable before completion.
Proof level
The accepted formats below identify possible evidence inputs. A format alone does not establish semantic or authoritative assurance; provenance and the commissioned proof contract set the supported level.
Claim boundary
Static controls are requirements, not execution evidence, provider attestation, or proof of production readiness.

Capabilities

recovery-objectives

Recovery Objectives

Define workload-specific availability, RTO, and RPO targets.

recovery-execution

Recovery Execution

Exercise restore, rollback, and failover against measured objectives.

incident-operations

Incident Operations

Test incident roles, communication, evidence, and corrective action.

Controls

DR-OBJECTIVES-001Recovery Objectives

Availability, RTO, and RPO are workload-specific and windowed.

Accepted evidence format: Metric
DR-RESTORE-001Recovery Execution

Restore, rollback, and failover are exercised and measured.

Accepted evidence format: Command output
DR-INCIDENT-001Incident Operations

Incident roles, communication, evidence, and corrective actions are tested.

Accepted evidence format: Artifact, Provider report

Conditional dependencies

Data & Storage, Cloud Infrastructure & Compute